A proposal is the document the client signs. It is raised from an accepted estimate, sent for signature through BoldSign, and completed when someone from your business counter-signs.
An estimate is built and agreed. Once it has an Accepted Date it is fixed — a change goes on a copy, which gets its own proposal and its own signature. The proposal's items come from the approved estimate, which is why the two always agree.
On the project's Proposals tab, add a proposal and pick one of that project's accepted estimates. The dropdown shows each one with its accepted date and total, and only estimates on the selected project appear.
Set the proposal Type to Ad-Hoc to record that you deliberately raised one without an estimate. Nothing is enforced either way — the type is how you say what you did, not a rule you have to satisfy.
Proposal Preview, on the Estimator, renders the estimate in the exact format the client will receive: your real template, your header and footer, the live numbers. Nothing is saved and nothing is sent.
Preview before accepting. Accepting locks the estimate, and the locked version is what the proposal is raised from — so the preview is the last point at which a wrong quantity is a two-second fix rather than a new revision.
If a proposal has already been raised from this estimate, the preview shows that proposal — including its agreed payment schedule. Until a proposal exists there is no schedule to show, because the payment terms are held on the proposal and nothing has been decided yet. ClientManager will not pick a payment template for you.
A proposal is generated into a document template. If your site has no template of type Proposal, preview stops and says so: “No Proposal templates exist yet. Add one under Admin, Document Templates.”
New sites are created with a starter Proposal template already in place. An older site may not have one — it is a one-off thing to set up, not something that can fail later.
Every line in the estimate is listed, grouped by Phase, then by Category, in the order you built them. The columns are Action, Qty, UOM, Description, Price.
Each phase carries a total. A category carries one only when it holds more than one line — a subtotal under a single line would just restate it.
The scope section is placed before your terms and conditions, because that is the order a client reads in: what am I buying, then on what terms.
Three special units charge per thousand dollars of something rather than per unit: $C per thousand of its category, $P per thousand of its phase, $M per thousand of the whole estimate. They are how a supervision or overhead line scales with the job instead of being retyped every revision.
On such a line the quantity you typed is almost always 1.00 and means nothing to a reader — “1.00 $M” beside $2,000 looks like a mistake. The proposal therefore prints the effective quantity: the base divided by a thousand. The line reads 200.00 × $10 = $2,000, and the arithmetic is visible to the client.
Discounts and credits appear as ($400.00) rather than −$400.00 — the accounting convention, and the same way the Estimator shows them, so the two never look like different numbers.
An estimate can carry two optional margins on top of its line prices — admin and profit. Plenty of businesses use neither. When they are set, they are built into the printed line prices, not listed as separate rows.
That means the Price beside a line is what the client is actually being charged for it, the phase and category totals add up to the grand total, and the grand total matches the “for a total of…” figure in your terms and the payment schedule below it. One number, everywhere on the page.
A client signer must be a resource on the project, marked both Client and Signatory on the Resources tab. There can be more than one — a second is normal, and more is expected — and they are sent in their Display Order.
The clients sign first; the Contract / Proposal Signer from your business signs last, which completes the contract. Set the default in Admin → Site Settings → Information Defaults — it is an employee, and their name and job title appear on the document.
The proposal form has its own Contract Signer field. Leave it empty and the proposal follows the business default — including if that default changes later. Fill it in only when someone else signs this one, such as a project manager on a commercial job.
The Generate dialog lists everyone in the order they will be asked to sign, with the counter-signer last and marked as such. Read it — it is the last point at which a missing email or the wrong signer is cheap to fix.
Pick a document template, then Send for Signature. ClientManager renders the proposal to PDF and hands it to BoldSign, which emails each signer in turn and waits for one before asking the next.
Each signer is listed with their status and the date it was sent, in the same dialog. The list updates as BoldSign reports back.
The signature is not the end of the paperwork — it is the start of the money. Once a proposal carries an Accept Date, a Payment Schedule button appears on its row, and that is where the invoicing happens.
Most construction and remodeling work is not invoiced once. It is billed in draws as the job reaches milestones — a deposit, then demolition, framing, drywall, substantial completion. See Payment Schedule for how that works, and Payment Templates for where the milestones come from.
You do not change a signed contract. Extra work is a Change Order — its own estimate, its own proposal, its own signature, and its own payment schedule. A job can collect a dozen of them, each billing independently of the contract and of each other.
Create it as a proposal with the type Change Order, and everything else is the same. Its invoices are referenced CO/ so a statement shows at a glance which belong to the contract and which to extra work.