ClientManager · How To

Project Status History

Every change of project status is recorded — what it changed from, what it changed to, who changed it, when, and how long it sat at the previous status.

Why it exists. A project's status tells you where it is now. It cannot tell you that this job sat in Awaiting Permit for eleven weeks, or that three of your last five jobs stalled at the same step. That is the difference between knowing a job is late and knowing why jobs are late — and it is the thing nobody can reconstruct from memory six months later.

1. What gets recorded

Nothing to switch on. Every time a project's status changes, a row is written automatically.

RecordedMeaning
From StatusWhat it was. Empty means the project had no status until this point.
To StatusWhat it became. Empty means the status was cleared.
Changed byThe user who made the change.
WhenDate and time.
Days at previous statusHow long it sat where it was — see below.
Nobody can edit it. There is no way to change or remove a row from the history, by design. A record of what happened is only worth having if it cannot be tidied up afterwards.

2. One project's history

Open a project and go to its Status History tab. The changes are listed newest first: each row shows the change itself, who made it, when, and how long the project had been sitting at the status it just left.

This is the view for a specific question — "what has actually happened on this job?" It is also the one to open before a client call, because it answers "when did you tell us that" without anybody having to remember.

3. Every change across the site

The Project Status Changes screen shows the same information for every project at once, with the project name on each row. Search and filter it like any other grid, and use Clear to drop the filters.

This is the view for the other question — "what moved this week?" Filter to a date range for a stand-up or a weekly review, or filter to a status to see everything currently piling up behind one step.

Both views are reporting surfaces. Changes are made on the project itself, by changing its status the way you always have. Neither screen edits anything.

4. Days at previous status

Each row carries the number of days between the previous change and this one — how long the project sat where it was before moving on.

It is blank on the first row of a project's history, because there is no earlier change to measure from.

This is the column worth paying attention to. A status that is consistently slow across many projects is a process problem, not a person problem, and it does not show up anywhere else in ClientManager. Three jobs that each spent five weeks in the same step is a pattern; one job that did is a story.

5. What it cannot tell you

It recordsIt does not record
That the status changedWhy it changed
Who changed itWho decided it should change
Changes from now onAnything that happened before this feature existed

For the why, put a note on the project. The history tells you a job moved to On Hold on the 14th; the note tells you it was because the client changed the tile.

And the history starts from when the feature was added. Projects that changed status before that have no rows — not an error, just nothing to show yet.

Related: Projects for the statuses themselves, and Reference data you control for editing the status list.