The milestones a job is billed against, and the share of the contract each one carries. Set these up once per kind of work and a contract's payment schedule starts from them instead of being typed out every time.
Side menu → Project Management → Payment Templates. A template is one list — Deposit, Start of demolition, Start of framing, Substantial Completion, Completion of Owner's punch list — with a percentage against each.
You will have several: a bathroom is not billed like a basement, and a lawn service is not billed like either. That is what the Project Category on a template is for.
| Project Category | The line of work — Construction & Remodeling, Home Services, Technology & Software. This is the one that matters. The twelve templates that ship with ClientManager are all Construction & Remodeling, so a cleaning company sets the filter to Home Services once and stops seeing them. |
| Project Type | Narrower, and usually left blank. Only worth setting for a template that genuinely applies to one kind of job and no other. The list offers the types inside the category you picked. |
| Neither | Reads as Any job in the list, and the template is offered everywhere. A template like that stays visible no matter how you filter — hiding your general-purpose schedules while you narrow down would be the opposite of helpful. |
The two dropdowns above the template list filter by exactly these. They do not delete anything; they decide what you have to look at.
This is the part worth reading twice. The percentages you fill in are the explicit ones. Every milestone you leave at zero splits whatever is left over, equally.
Take the seeded Basement template — Deposit 20%, Start of demolition 20%, Substantial Completion 7%, Owner's punch list 3%, and five milestones at zero:
| Explicit | 20 + 20 + 7 + 3 = 50% |
| Left over | 100 − 50 = 50% |
| Five zeros | 50 ÷ 5 = 10% each |
So a template whose numbers add up to 50% is not broken — it bills the whole contract. The screen shows you the arithmetic as you edit, so you never have to work it out.
It also means a template with no percentages at all still works: every milestone shares equally. Three milestones and no numbers bills in thirds.
Each milestone can carry a second percentage used when a change order is being billed rather than the contract. Leave it blank if the split is the same — on the schedules ClientManager ships, all but one of them are.
The exception is Start of demolition: 20% of a contract, 50% of a change order. That is how the schedules we started from were set up; we are not claiming it as a rule, and your own work may split differently.
Templates are a plain full-width list. ClientManager ships twelve construction templates — General, Bathroom, Kitchen, Basement, Addition, New Home, Change Order and others — marked Shared: they belong to no site and cannot be edited directly, so the only thing you can do with one is press the Copy button right there on its row.
Copy makes a full copy — milestones and percentages included — under your own site, and opens it immediately so you can start changing it.
Click one of your own templates (no Shared badge) and a window opens with that template's milestones on the left and everything Available on the right. Both are ordinary grids — sortable, pageable, same as everywhere else in ClientManager.
Tick as many rows as you want in Available, then press Add Selected to put all of them on the template in one go. × on a row in the left grid takes a milestone back off. Double-click the Order, % or CO % cell on any row to change it — the left grid always stays sorted by Order, so a freshly-added milestone lands in its real place rather than wherever it happened to be added from.
Save writes the percentages and the order for the whole template at once. It stays disabled until the numbers are valid — see the percentages rule above.
A cleaner does not bill against "Start of drywall hanging". The whole set is yours to replace, in two steps:
| 1. Add a template | The + beside the page title. Name it for the work — "Weekly Clean", "Lawn Contract", "Room Repaint" — and set its Project Category — that is what keeps it out of everybody else's way. |
| 2. Add its milestones | Tick any that already fit in Available and press Add Selected. For ones that do not exist yet, the + beside the Available search box creates a milestone of your own — "First visit", "Monthly service", "Final walkthrough" — and puts it straight on the template you are editing. |
Delete on a template you own deactivates it, so it stops being offered on new contracts. Contracts that already used it are untouched — they hold their own copy of the schedule, which is the whole reason a contract copies rather than points at the template.