Español →
← How To Guides
ClientManager · How To

Organizing Work by Division

Tag projects and leads to a part of your business, so you can see how each division, branch or crew is actually doing — without keeping a separate spreadsheet.

Who this is for. If your business is one team working out of one place, you do not need any of this and will not see it. It earns its place the moment you have two divisions, two branches, or a handyman crew whose numbers you want to read separately from the remodeling side.

1. Building your structure

Where: Site Settings → Org Structure. Administrator-only.

You build a tree that matches how your business is actually arranged. Each level is named by you — there is no fixed list to squeeze into.

A two-level businessA larger one
Remodeling
Handyman Services
Division 1
  → Northern Branch
    → Framing Crew
  → Southern Branch
Two levels is a perfectly good answer. Most businesses that need this at all need exactly one split. Build the tree you have, not the one an org chart says you should.

Until you build a tree, nothing else in this guide appears. The Organization Unit field stays hidden on projects and leads, because an empty dropdown on every record is clutter for a business that does not work this way.

2. Tagging a project or lead

On a project or a lead, pick an Organization Unit. That is the whole job.

Pick the most specific thing that is true. If the framing crew did it, tag the framing crew — not the division above them.

You cannot tag it "too deep". Reporting works upward, so a project tagged to a crew still counts in that crew's branch, and in that branch's division. Tagging precisely costs nothing and tells you more.

Leaving it blank is fine too. An untagged project simply does not appear in a by-division total, which is honest — better than being guessed into the wrong column.

3. How reporting adds it up

Take this structure:

ProjectTagged toCounts toward
Kitchen remodelFraming CrewFraming Crew, Northern Branch, Division 1
Deck repairNorthern BranchNorthern Branch, Division 1
Office fit-outDivision 1Division 1

All three land in Division 1, even though each was tagged at a different depth. A report asking "how did Division 1 do?" finds all of them.

That is what makes it safe to tag precisely: you are not choosing between detail and the big picture, you get both from the same tag.

4. Seeing it in the lists

ScreenWhere to find it
ProjectsAdd Organization Unit from Choose Columns.
LeadsShown as a column already.
BothAvailable in the Advanced Filter, as a dropdown of your own units.

The filter is the quick way to answer "what is the Handyman side working on right now?" without building a report.

5. Getting it right

Build the tree before you start tagging. Retagging a hundred projects because the structure changed is an afternoon nobody enjoys.

Name units the way your people speak. If everyone says "the paint crew", call it Paint Crew. A unit nobody recognises gets tagged wrongly or not at all.

Tag leads as well as projects. Tagging only projects tells you what each part of the business delivered; tagging leads tells you what each part is winning, and that is the number that warns you early.

Deactivate rather than delete. A unit you no longer use can be switched off so it stops appearing in dropdowns, while the projects tagged to it keep their history and stay in last year's figures.
Related: Projects, Leads, and Reference data you control.