A lien waiver is what you request and receive from a vendor or sub when you pay them — it releases their right to file a lien against the client’s property for the amount covered. ClientManager tracks the request and the document you get back; it does not generate the waiver itself.
Why it matters. Every remodeler and GC runs into this eventually — a sub who was never paid files a lien against your client’s house, over money that was actually your responsibility to settle. A waiver on file for every payment is the paper trail that protects the client, and you, from that happening after the fact.
1. Where it lives
Open a project → the Procurement group → the Lien Waivers tab. The same list, every project at once, also sits on Site-wide Views → Operations → Lien Waivers — right beside Compliance, since it answers the same kind of question (what still needs chasing) for vendor lien releases instead of insurance and licences.
Why it is not inside the Compliance tab itself. Compliance tracks things that expire — an insurance certificate, a licence. A lien waiver does not expire; it is tied to one specific payment on one specific project. Different shape, so it gets its own tab rather than being forced into the same list.
2. Recording a lien waiver
Click the + button. From the project’s own tab the project is already chosen; from the site-wide list you pick one first.
Payee Type — Contact (an individual) or Organization (a company). Always the vendor or sub, never your own staff — that is what the Commissions tab is for.
Vendor / Sub — who the waiver is from.
Waiver Type — the legal category. ClientManager ships with the four standard ones (Conditional/Unconditional × Progress/Final Payment); add your own under Reference Admin if you use different language.
Amount Covered, Through Date, Requested, Executed and Received dates, and free-text Notes.
Executed date vs. Received date. Executed is the date actually printed or signed on the waiver document itself — the legally operative date. Received is when it physically landed in your hands. They are often close together but are not the same thing, and a waiver dated for one payment can arrive days after the fact.
3. Picking invoices from the vendor’s real bills
For an Organization payee, the form also shows a Vendor Bills on this project checklist — every real Bill already on file for that vendor on this project. Check the ones this waiver covers and the Invoice Number(s) field above fills in by itself, using each bill’s own reference number (or “Bill 12” when it has none).
The field stays plain text underneath. Checking a box rebuilds it from scratch, but you can still type into it by hand afterward — useful for an invoice that was never entered as a CM Bill. Toggling a checkbox again, though, overwrites whatever you typed with the checked set.
An individual Contact payee never shows this list — a Bill is always billed from a company, never from a person directly.
4. Attaching the signed document
The right-hand side of the form is the same Certificates on file panel used for insurance and licences. Pick the period it covers and choose a file; it uploads once you save the waiver (a brand-new one holds the file until it has an id).
Every file stays, even an old one. Removing a certificate here hides it, it does not delete it — the same no-deletes rule as everywhere else in ClientManager.
5. Received vs. Outstanding
Status is read straight from the Received date — set it, the row shows a green Received badge; leave it blank, it shows a grey Outstanding one. A summary line above the grid totals how many of each.
Not a full accounting system, on purpose. This does not try to be a ledger of cash movements — it is simply “did we actually get this back from the vendor.”
6. Across every project
The Operations → Lien Waivers view adds Project and Client columns so you can see every outstanding waiver across the whole business at once — the screen for “which vendors still owe us a waiver before we cut their next check.”
7. What the vendor sees
A vendor with Portal access has their own read-only Lien Waivers tab on their project — proof that a waiver covering them is on file, and whether it has been received. They see only their own waivers, never another vendor’s, and cannot upload, edit or remove anything from there.
Deliberately receive-only. The vendor sees status, not a way to self-serve a waiver into existence. You still request and collect it the way you always have — this just makes the “did you get my waiver” phone call unnecessary.
Limits worth knowing
ClientManager does not generate the waiver document. You still produce it the way you always have; this tracks the request and the document you get back.
No e-signature flow yet. A real template plus the existing BoldSign integration (already used for Proposals) could add a send-and-track flow later — not built today.
Amount Covered reduces the project’s Projected Margin, the same as a Bill or Expense — see the Project Budget tab. It counts once recorded, not once paid.