Cost Database

Your price book: what the work costs, priced once and reused on every Estimate. It is what the Estimator is built on — an estimator picks from here rather than retyping descriptions and prices, and the quality of your estimates is mostly the quality of this.

Where it lives, and what is in it before you start

1

Side menu → Project Management → Cost Database

You are not starting from nothing. ClientManager ships a shared core catalog, and every site sees that catalog alongside its own items — nothing is copied to you, so the shared items simply appear in your pickers alongside your own. Their prices are samples and are not current — see the warning below before you estimate with any of them.

Anything you add belongs to your site alone and nobody else can see it. In the Estimator's catalog panel the two sit together in one tree.

These are sample costs, not current prices. Every cost and price in the shared catalog came from a decades-old sample set — treat them as if they were written in 2002, because in substance they were. They are here to show you the structure: item codes, descriptions, units of measure, and what goes into an assembly. That structure is sound and is worth starting from. The money is not.

Set your own prices before you estimate with them. Copy the items you want into a cost database of your own, then price them. Until you do, every number they produce is a guess from another decade.

Nothing in ClientManager adjusts these for you, and nothing should — an inflation factor applied to a 2002 price is still not your price. What a material costs is a fact you can look up; what you charge for it is your decision.
2

Four levels, and why there is more than one database

Cost DatabaseOne price book. You can keep several — a separate book per region, per division, or last year's prices kept intact while you build next year's. An Estimate names one as its primary, but an estimator can pull items from any of them into the same estimate.
CategoryGroups items, and carries your trade sequence — demolition before excavation before concrete. That order is what the Estimator lists categories in, and what the schedule follows, so it is worth setting properly once.
Cost ItemOne priced thing. The unit of everything below.
Cost AssemblyA named bundle of Cost Items, each with its own quantity — "Small Bathroom", "Garage Slab". An estimator picks the assembly instead of hunting down eleven items, and every one of them lands with the right quantity.

Pricing an item

1

Priced one way or the other, never both

An item is priced either with the Material / Labor / Sub / Equipment breakdown, or with a single Total Only figure. The form enforces it: put a number in Total Only and the four component boxes clear and lock; clear Total Only and they open back up.

This is not tidiness. The estimate rollups add Total Only to the four component costs. An item carrying both would be counted twice and the estimate would come out high without anything looking wrong.
2

The fields, and which ones do real work

Description*Required, and the only required field. It is what an estimator reads in the picker and what the client eventually reads on the proposal, so write it for them — "Hang and finish drywall, ceilings" rather than "Drywall 2".
Item CodeYour own reference. Optional and free text — ClientManager does not require it to be unique or use it to match anything.
Cost DatabaseWhich price book the item belongs to.
CategoryDetermines where the item appears in the Estimator's tree, and therefore which category gets created on a phase when somebody adds it.
UOMUnit of measure — EA, SF, LF, HR. Carried onto the estimate line and printed on the proposal, so it is what the client sees the quantity measured in.
QuantityA default quantity for the item. An estimator sets the real quantity when adding it, so treat this as a convenience rather than a control.
Job RoleThe crew that does the work, and one of the few fields here that drives a calculation: labor hours on an estimate line are worked out from the role's rate, so an item with the wrong role prices its labor at the wrong rate. Change the item on a line and the hours are reworked from the new role.
Action VerbThe verb that reads with the crew — Install, Remove, Supply. Carried onto the line and shown on the proposal in its own Action column.
Lead TimeWorking days between ordering (or applying) and having it — a building permit 15, custom cabinets 40. Set once here, beside the price, and every estimate inherits it. See the note below about when it actually does something.
Vendor CodeYour reference for who supplies it. Stored with the item; it does not link to a Vendor record.
NotesKept with the item.
Internal Use NotesThe same, kept separately for things you would not want read out — which supplier is unreliable, why the price is what it is.
ActiveClear it to retire an item. See "Retiring an item" below — this is how you remove things, not deletion.
Lead Time only fires with Special Order. On its own it is just a number on the item. When an estimator also ticks Special Order on the line, the two together put a lead-time task at the front of that line's phase and make the phase's first real task wait for it. Left blank, nothing is scheduled and nothing is gated.
Assembly Qty Only 1 is saved with the item but nothing currently reads it. It is recorded here so you are not left wondering why ticking it changes nothing.

What an Estimate takes from here — and what it keeps reading

1

The one thing to understand about this screen

These two behave in opposite ways, and knowing which is which is the difference between trusting your numbers and not:

Copied, onceDescription, UOM, all five unit costs, Action Verb and Job Role are copied onto the estimate line at the moment it is added. Raise a price here tomorrow and every estimate already built keeps the price it was built with. That is deliberate — a quote you have sent should not move because somebody edited the price book.
Read liveThe database's Admin and Profit margins are not copied. An estimate uses its own if it has them, and otherwise falls back to the database's current values. So changing those two does move existing estimates that never set their own.
To pull new prices forward deliberately, open the estimate and use Update $. It re-reads unit costs from the catalog for every line that came from a cost item and whose item is still active — lines somebody typed by hand have nothing to re-read and are left alone. It is refused on an accepted estimate.
2

Margins on the database: two work, five do not

A Cost Database carries seven margin percentages. Only Admin and Profit are read by anything — they are the fallback described above, and they are what lifts an estimate's rolled-up total above the priced lines.

Margin — Material, Labor, Sub, Equipment and Total are stored and never read. They look like they price something and they do not. Filling them in changes no number anywhere; leaving them blank costs you nothing.
Markup is a different thing from margin, and it is what actually prices a line. Markup is inherited Site Settings → estimate header → line, not from the Cost Database — see Build an Estimate.

Keeping it up to date

1

Retiring an item

Clear Active rather than deleting. The item disappears from every picker immediately, so nobody can add it to a new estimate — and every estimate that already used it is untouched, because those lines hold their own copy of the price. Update $ also skips retired items, so an old estimate cannot be quietly repriced from something you withdrew.

2

Importing a price book

A supplier's price list or an old system's export can come in through Data Import rather than being typed. It creates a new Cost Database — it does not merge into an existing one — and builds the categories as it goes from the category names in your file, numbering them in the order they appear. Rows with no category land in one called "General".

All or nothing: the database, every category and every item arrive together or none of them do. A failed import does not leave a half-filled price book behind for somebody to find later.
An import does not carry everything. Item Code, Description, Category, UOM, the five costs, Job Role, Vendor Code and both Notes fields come across. Lead Time, Action Verb, default Quantity and Assembly Qty Only 1 do not — if you rely on lead times for scheduling, they have to be set afterwards.
3

Who can change it

The Cost Database sits behind the same role-based permissions as the rest of ClientManager, and it is worth restricting: a price everyone can edit is a price nobody can rely on. Every item records who created it and who last changed it, with the date and time of each.