A Project's Estimate is built in the Estimator — one screen holding your phases, the priced lines, and your cost database side by side. Pricing is driven by each item's own markup, not a single number typed once.
This is a complete estimating system rather than a pricing field on a project: a cost database, assemblies, three levels of structure, per-item markup, four-part cost breakdowns, allowances, and a proposal that comes out of the structure you built. It is the largest single piece of ClientManager, and it rewards an hour of reading before the first real estimate.
Open a Project → Estimates tab. Click New Estimate to start one. To work on an estimate, click its description or its Estimator button — both open the full Estimator, which is where all the real work happens. The Edit button beside them opens only the header fields: description, dates, markups and the cost database.
On the left, Phases — your phases and the categories under each one. In the middle, the line items for whatever you have selected. On the right, your cost database: categories and their cost items, ready to add. Clicking a phase or a category on the left is what tells the other two panels what to show.
The Estimator saves as you go. Editing a cell in the line-item grid writes that change when you leave the cell; adding a phase, a category or a line saves immediately. Nothing is held back waiting for a Save.
Phase is free text you type per estimate (e.g. "Kitchen," "Site Work") — add one with + Phase, just a description. Category is different — a fixed, admin-managed list from your Cost Database, picked from a dropdown rather than typed. Item is the actual priced line.
This is the part that surprises people. You do not have to build the structure before you price anything. Add a phase, then tick cost items and add them — any category those items belong to is created on that phase for you, in one step with the lines. Tick a plumbing item and a framing item together and both categories appear.
+ Category exists for the other case: putting a category on a phase deliberately, while it is still empty, because you know that work is coming and want it visible in the structure now.
The right-hand panel is a catalog, not a one-at-a-time picker. Click a category to list its items, tick what you want and set each quantity, then move to another category and keep ticking — your ticks survive moving around the tree. Nothing is added until you say where it goes. Then:
| Add to Current Phase | Puts everything ticked into the one phase selected on the left. The everyday case. |
| Add to Multiple Phases… | Opens a list of the estimate’s phases with a checkbox each. The whole ticked basket is added to every phase you check, separately — so three phases checked means those lines priced three times, once under each. This is for work that genuinely repeats: the same rough-in in Basement, 1st Floor and 2nd Floor. The phase you had selected is already checked when the dialog opens. |
Either way the categories are created on each destination phase as needed, the lines land under them, and labor hours are worked out from each item’s crew. ClientManager then tells you what it did — "Added 14 lines to 3 phases."
Use Assembly copies every item of a predefined Cost Assembly into the selected phase in one click. This is the fastest way to estimate work you do often — most remodelers build their own assemblies for repeat jobs ("Small Bathroom," "Master Bathroom") and then start every such estimate from one.
If an assembly adds nothing, or adds fewer lines than you expected, the message tells you which of three things happened:
The estimate carries a primary cost database, but you can point the catalog panel at a different one and pull items from it into the same estimate. If the estimate has no database of its own, the Estimator says so and tells you which one it fell back to.
No cost database carries everything, and leaving the Estimator to set one item up — then finding your way back to where you were — is how an afternoon disappears. Two buttons sit beside the Add buttons so you can stay where you are:
| Add Custom Line… | Opens the normal line editor with a blank line, already set to the phase and category you have selected. Type the description, quantity and prices. It goes onto this estimate only — nothing is added to any cost database. The right answer for a one-off, which most of them are. |
| Cost Items… | Opens the real Cost Items maintenance screen in a window, already pointed at the cost database you are browsing. Add or correct items there, close it, and the catalog refreshes so you can tick the new item straight away. Everything added here is seen by every future estimate. |
Every item carries its own markup percentages, editable right in the grid or in the item’s edit dialog, and the price is always calculated from the line’s own figures. There are five of them — Material, Labor, Sub, Equipment and Total Only — but a line only ever uses one side of that: the four components, or Total Only, never both.
What a new line starts at is inherited, not fixed. The chain runs Site Settings → estimate header → the line: the first level that has markups set wins, and the estimator can change the line afterwards. The familiar 25% is only the last resort, used when nothing is set at either level above.
A quantity can carry up to four decimal places — a 1.0625 waste factor, a third of a square, an hour split three ways. The grid shows at least two and up to four, so an ordinary 2.00 stays readable while 1.0625 is not quietly rounded away.
An item is either priced with the full Material/Labor/Sub/Equipment breakdown, or with a single Total Only cost + markup — the two modes are mutually exclusive, entering one clears the other.
Show costs and Show markups are separate switches, so you can have unit costs visible while the markup percentages stay out of the way, or the reverse when you are reviewing margin. The running totals above the grid follow the same switches.
Update $ re-reads unit costs from the cost database, keeping each line’s own markup. Re-Calculate re-works labor hours on every line from this estimate’s rates. Both act on the whole estimate, and both are refused on an accepted one.
Update $ only touches lines that came from a cost item and whose cost item is still active. A line you typed in yourself has nothing to re-read, and is left exactly as it is. That is why the result reads "Updated 9 of 40 lines" rather than just "done" — the two numbers are worth reading, because they tell you how much of your estimate is actually catalog-driven.
Two checkboxes on an item: Allowance Item (a budget line the client will choose against later) and Special Order. An Allowance item with no Actual Cost set shows as an "unresolved allowance," and vendor-tagging is blocked until that is resolved.
Estimating is iterative and wrong lines happen. Delete a line with the × beside it, which asks you to confirm first. A phase's × removes the phase and everything under it, also with a confirmation.
Proposal Preview shows the estimate in the exact format the client will receive — the real proposal template, with your site's header and footer. Use it before accepting: this is the check you make while you can still change something. Nothing is saved by previewing.
The proposal carries a General Scope of Work section listing every line in the estimate, grouped by phase and then by category. The columns are Action, Qty, UOM, Description and Price.
Each phase gets a total, and a category gets one when it holds more than one line — a subtotal under a single line would only restate it.
An estimate reaches the client portal only when it is marked Client Visible, which you set on the estimate header. Work-in-progress versions stay internal — send an estimate to be reviewed once it is close to the version that might be final, not before. Vendors are different again: a vendor asked to quote sees only the line items that might go to them, never the whole estimate.
When the client agrees, click Accept in the Estimator toolbar. You are asked to confirm once, and that is the moment everything changes: the estimate becomes read-only in place, the cost database panel closes, and the Accept button disappears.
Back on the Estimates grid, Payment Schedule is the next step — and it comes before acceptance, because the schedule is part of what the client signs. Work Schedule becomes enabled once the estimate has an Accepted Date, and builds the project schedule from the agreed work.
On a Proposal, use its Estimate-linking grid to attach one or more Estimates — the Proposal's total becomes the sum of whatever's linked. Separately, you can select specific estimate items and a vendor to generate a Quote Request (RFQ) directly, independent of the Proposal/Invoice path. Quotes are requested by the estimator, for the estimator — they are how the real numbers arrive, long before the client sees anything.
From the outer Estimates grid you also have Print List, Export to Excel and Print Reports, which generates a document such as a Preliminary Budgeting Estimate for review before optionally saving it to Project Attachments.