A Project's Estimate is built in the Estimator — one screen holding your phases, the priced lines, and your cost database side by side. Pricing is driven by each item's own markup, not a single number typed once.

This is a complete estimating system rather than a pricing field on a project: a cost database, assemblies, three levels of structure, per-item markup, four-part cost breakdowns, allowances, and a proposal that comes out of the structure you built. It is the largest single piece of ClientManager, and it rewards an hour of reading before the first real estimate.

Getting started

1

Start from the Project's Estimates tab

Open a Project → Estimates tab. Click New Estimate to start one. To work on an estimate, click its description or its Estimator button — both open the full Estimator, which is where all the real work happens. The Edit button beside them opens only the header fields: description, dates, markups and the cost database.

Worth knowing: the Estimator is a real page with its own address, so you can middle-click either link to open it in a new tab and leave the estimate list where it is.
2

The three panels

On the left, Phases — your phases and the categories under each one. In the middle, the line items for whatever you have selected. On the right, your cost database: categories and their cost items, ready to add. Clicking a phase or a category on the left is what tells the other two panels what to show.

3

There is no Save button

The Estimator saves as you go. Editing a cell in the line-item grid writes that change when you leave the cell; adding a phase, a category or a line saves immediately. Nothing is held back waiting for a Save.

The exception: an accepted estimate is read-only, everywhere. An accepted estimate is the record of what a client agreed to, so it cannot be edited and it cannot be un-accepted. To change one, use Duplicate on the Estimates tab and work on the copy — it goes through its own proposal and its own signature.

Three levels: Phase, Category, Item

1

What each level is

Phase is free text you type per estimate (e.g. "Kitchen," "Site Work") — add one with + Phase, just a description. Category is different — a fixed, admin-managed list from your Cost Database, picked from a dropdown rather than typed. Item is the actual priced line.

Worth knowing: categories appear under a phase in your trade sequence — the display order set on the category itself — not in the order you happened to add them. The same order governs the line items. It is the order the work actually happens in, which is also the order the schedule wants.
When one job runs out of sequence: the ▲ and ▼ arrows beside a category move it within that phase only. Your company-wide trade order is untouched, so overriding it here for one unusual job does not change how the next estimate starts.
Deleting takes the contents with it. Removing a category removes its lines; removing a phase removes its categories and their lines. ClientManager counts them in the confirmation first — "Delete the phase Basement, with 4 categories and 23 lines?" — because from the phase list you cannot see what is underneath.
2

You rarely need "+ Category"

This is the part that surprises people. You do not have to build the structure before you price anything. Add a phase, then tick cost items and add them — any category those items belong to is created on that phase for you, in one step with the lines. Tick a plumbing item and a framing item together and both categories appear.

+ Category exists for the other case: putting a category on a phase deliberately, while it is still empty, because you know that work is coming and want it visible in the structure now.

Worth knowing: + Category, Use Assembly and Add to Current Phase stay disabled until a phase is selected on the left — they all act on "the selected phase". If one looks greyed out, click a phase first. Add to Multiple Phases… is the exception: it only needs at least one phase to exist, since you pick the destinations in the dialog.

Adding items

1

Tick a basket, then choose where it goes

The right-hand panel is a catalog, not a one-at-a-time picker. Click a category to list its items, tick what you want and set each quantity, then move to another category and keep ticking — your ticks survive moving around the tree. Nothing is added until you say where it goes. Then:

Add to Current PhasePuts everything ticked into the one phase selected on the left. The everyday case.
Add to Multiple Phases…Opens a list of the estimate’s phases with a checkbox each. The whole ticked basket is added to every phase you check, separately — so three phases checked means those lines priced three times, once under each. This is for work that genuinely repeats: the same rough-in in Basement, 1st Floor and 2nd Floor. The phase you had selected is already checked when the dialog opens.

Either way the categories are created on each destination phase as needed, the lines land under them, and labor hours are worked out from each item’s crew. ClientManager then tells you what it did — "Added 14 lines to 3 phases."

Worth knowing: after a successful add, every tick clears and the quantities go back to 1, so the next basket starts clean and you cannot add the same set twice by accident. Show cost database hides the whole panel when you want the line items full-height instead.
One thing will lose a basket: changing the cost database in the dropdown clears every tick, because the items you had chosen belong to the database you just left. Add what you have ticked before you switch.
Worth knowing: the category list shows every category with its item count, and Show empty categories reveals the ones holding no cost items yet — useful for spotting gaps in your own database.
2

From a Cost Assembly

Use Assembly copies every item of a predefined Cost Assembly into the selected phase in one click. This is the fastest way to estimate work you do often — most remodelers build their own assemblies for repeat jobs ("Small Bathroom," "Master Bathroom") and then start every such estimate from one.

If an assembly adds nothing, or adds fewer lines than you expected, the message tells you which of three things happened:

  • “no active catalogue items” — every item on the assembly points at a cost item that has been deactivated.
  • “every item is optional, and none were ticked” — not a fault. An assembly used without anyone answering its questions does not quietly answer yes for you.
  • “skipped … no category” — the catalogue item behind the line has no Category, and a line needs one to sit under. Set a Category on those cost items in the Cost Database and run the assembly again.
Why a line with no category is skipped rather than added. The Estimator lists items by phase and category, so a line with no category would be invisible on this screen while still counting toward the estimate total and printing on the proposal. A charge nobody can see or edit is worse than a line that was not added — so it tells you instead, and says how many.
3

Switching cost databases mid-estimate

The estimate carries a primary cost database, but you can point the catalog panel at a different one and pull items from it into the same estimate. If the estimate has no database of its own, the Estimator says so and tells you which one it fell back to.

4

When the category doesn’t have what you need

No cost database carries everything, and leaving the Estimator to set one item up — then finding your way back to where you were — is how an afternoon disappears. Two buttons sit beside the Add buttons so you can stay where you are:

Add Custom Line…Opens the normal line editor with a blank line, already set to the phase and category you have selected. Type the description, quantity and prices. It goes onto this estimate only — nothing is added to any cost database. The right answer for a one-off, which most of them are.
Cost Items…Opens the real Cost Items maintenance screen in a window, already pointed at the cost database you are browsing. Add or correct items there, close it, and the catalog refreshes so you can tick the new item straight away. Everything added here is seen by every future estimate.
Which one? If you will never price this again, use Add Custom Line. If it is something your company does regularly, put it in the cost database so it is there next time, priced the same way. A cost database earns its keep by being curated — three slightly different spellings of the same stud, at three different prices, helps nobody.
Worth knowing: an item you add to a cost database belongs to your company only. It sits in your catalog beside the shared items, is invisible to everyone else, and nothing you do here changes the shared items. Add Custom Line stays greyed out until both a phase and a category are selected, because that is where the line would go.

Pricing

Check what the price started as. Items you took from the shared catalog arrived with sample costs from a decades-old set — in substance, 2002 prices. Markup applied to a 2002 cost is still a 2002 number, just a larger one. Price your own items first; everything on this page assumes the underlying cost is yours and is right.
1

Markup is inherited, then owned by the line

Every item carries its own markup percentages, editable right in the grid or in the item’s edit dialog, and the price is always calculated from the line’s own figures. There are five of them — Material, Labor, Sub, Equipment and Total Only — but a line only ever uses one side of that: the four components, or Total Only, never both.

What a new line starts at is inherited, not fixed. The chain runs Site Settings → estimate header → the line: the first level that has markups set wins, and the estimator can change the line afterwards. The familiar 25% is only the last resort, used when nothing is set at either level above.

Worth knowing: this means the Mark-ups section on the estimate header is worth filling in — it is what every line added afterwards will start from. It does not reach back and change lines that already exist.
Worth knowing: markups are stored as whole percentages — type 50 for a 50% markup, not 0.50.
2

Quantities take four decimals

A quantity can carry up to four decimal places — a 1.0625 waste factor, a third of a square, an hour split three ways. The grid shows at least two and up to four, so an ordinary 2.00 stays readable while 1.0625 is not quietly rounded away.

Worth knowing: the proposal shows the same precision. What the client reads matches what you priced.
3

Total Only vs. the four-part breakdown

An item is either priced with the full Material/Labor/Sub/Equipment breakdown, or with a single Total Only cost + markup — the two modes are mutually exclusive, entering one clears the other.

4

Showing and hiding the money columns

Show costs and Show markups are separate switches, so you can have unit costs visible while the markup percentages stay out of the way, or the reverse when you are reviewing margin. The running totals above the grid follow the same switches.

5

Update $ and Re-Calculate

Update $ re-reads unit costs from the cost database, keeping each line’s own markup. Re-Calculate re-works labor hours on every line from this estimate’s rates. Both act on the whole estimate, and both are refused on an accepted one.

Update $ only touches lines that came from a cost item and whose cost item is still active. A line you typed in yourself has nothing to re-read, and is left exactly as it is. That is why the result reads "Updated 9 of 40 lines" rather than just "done" — the two numbers are worth reading, because they tell you how much of your estimate is actually catalog-driven.

Important: Update $ overwrites unit costs you have corrected by hand on a line that came from the catalog. If your cost database prices are older than your estimate, that is a step backwards — use it deliberately, not as a habit.
6

Allowance items and Special Order

Two checkboxes on an item: Allowance Item (a budget line the client will choose against later) and Special Order. An Allowance item with no Actual Cost set shows as an "unresolved allowance," and vendor-tagging is blocked until that is resolved.

Worth knowing: what the client eventually chooses is recorded on the Project's Allowances tab as the allowance's Final Amount — higher or lower than the allowance — so the accepted estimate itself never has to be touched.

Removing things

1

Correcting mistakes while you estimate

Estimating is iterative and wrong lines happen. Delete a line with the × beside it, which asks you to confirm first. A phase's × removes the phase and everything under it, also with a confirmation.

Worth knowing: there is no way to delete several lines at once, on purpose. Removing many estimate lines in one click is the kind of action nobody misses until the day it takes out the wrong eleven.
Important: this is for work in progress only. Once an estimate is accepted nothing can be removed from it — see Duplicate, above.

Before you send it

Is any line still on a sample price? This is the last point at which that is cheap to fix. Anything pulled from the shared catalog and never repriced is carrying a figure from another decade, and once the client has signed it is your contract price. A quick scan of the cost column is worth more here than anywhere else in this guide.
1

Proposal Preview

Proposal Preview shows the estimate in the exact format the client will receive — the real proposal template, with your site's header and footer. Use it before accepting: this is the check you make while you can still change something. Nothing is saved by previewing.

The proposal carries a General Scope of Work section listing every line in the estimate, grouped by phase and then by category. The columns are Action, Qty, UOM, Description and Price.

Each phase gets a total, and a category gets one when it holds more than one line — a subtotal under a single line would only restate it.

Worth knowing: negative lines — discounts, credits — print in parentheses, as ($400.00), the same way the Estimator shows them.
Worth knowing: clients see one money column per line — the extended price — and no component or markup breakdown. There is nothing in the preview that invites a line-by-line negotiation.
2

Who can see which estimate

An estimate reaches the client portal only when it is marked Client Visible, which you set on the estimate header. Work-in-progress versions stay internal — send an estimate to be reviewed once it is close to the version that might be final, not before. Vendors are different again: a vendor asked to quote sees only the line items that might go to them, never the whole estimate.

3

Accepting it

When the client agrees, click Accept in the Estimator toolbar. You are asked to confirm once, and that is the moment everything changes: the estimate becomes read-only in place, the cost database panel closes, and the Accept button disappears.

This cannot be undone. An accepted estimate is the record of what a client agreed to — it cannot be edited and it cannot be un-accepted. If you accept the wrong one, the way forward is Duplicate on the Estimates tab and working on the copy, which goes through its own proposal and signature.
Worth knowing: the accepted date is today, in your site's own time zone, and it can never be a future date. You can also accept from the Estimates tab by setting the Accepted Date on the estimate header and saving — the same warning appears there.

After the Estimate is accepted

1

Generate an Invoice, or a Schedule

Back on the Estimates grid, Payment Schedule is the next step — and it comes before acceptance, because the schedule is part of what the client signs. Work Schedule becomes enabled once the estimate has an Accepted Date, and builds the project schedule from the agreed work.

Construction and remodeling work is billed in draws, not in one invoice. That is progress billing: a schedule of milestones agreed as part of the contract, and an invoice raised for each one. So the estimate leads to a Payment Schedule, the schedule goes into the proposal, and the invoices are raised from the proposal once it is signed. An estimate can still be edited after acceptance; a signed contract cannot, which is the reason billing follows the contract.
Worth knowing: both of these need an Accepted Date, which is what the Accept button sets.
2

Link it to a Proposal, or request vendor pricing

On a Proposal, use its Estimate-linking grid to attach one or more Estimates — the Proposal's total becomes the sum of whatever's linked. Separately, you can select specific estimate items and a vendor to generate a Quote Request (RFQ) directly, independent of the Proposal/Invoice path. Quotes are requested by the estimator, for the estimator — they are how the real numbers arrive, long before the client sees anything.

Terminology

1

Words worth knowing

From the outer Estimates grid you also have Print List, Export to Excel and Print Reports, which generates a document such as a Preliminary Budgeting Estimate for review before optionally saving it to Project Attachments.

Phase Category Cost Assembly Allowance Item Special Order Total Only Client Visible Accepted Date